Preventative Maintenance
Cranes and Heavy Machinery
In the manufacturing industry, downtime refers to the period of time in which a company’s factory or a specific line is not producing a product. This is expensive to a company’s bottom line and profit margins, as often downtime is unplanned and occurs while normal business functions continue, including paying employees and ordering material to manufacture products. It becomes even more expensive if you factor in the opportunity cost of having a machine sit idle. One research study showed unplanned downtime cost companies an average of $260k for every hour of downtime, while another study found that car manufacturers lost $22k for every minute of downtime.
We offer 6 inspection plans based on your current service needs, to ensure your compliance with current OHSA and CSA (B167) standards. By scheduling routine repairs, maintenance work and inspections, we will help prevent equipment safety issues, breakdowns and compliance violations but also help avert component failure. These programs also have the added benefit of helping to avoid unnecessary production downtime.
- Air Balancers
- Chain Falls
- Electric hoists
- Lift assists
- Pneumatic hoists
- Stacker cranes
- Overhead Cranes
Management Responsibilities:
Cranes and hoists shall be operated and maintained through a coordinated and well documented equipment management program, carried out by competent personnel with clearly defined responsibilities, including:
- Orientation
- Training
- Occupational health and safety
- Protocols for testing, inspections, maintenance and monitoring, including timings, risk assessment and emergency management
Key features
Skilled Technicians
Expert teams trained with 1,200+ hours annually to ensure safe, efficient inspections.
Digital Reporting
Wireless, paperless reporting with access to equipment records anytime, anywhere.
Fast Results
Wireless technology ensures inspection are processed quickly and without delays.
24/7 Access
Certificates, documentation, manuals, and reports always available through mobile access.
Standardized Inspections
40+ standard inspection types offered, making us your single source for facility compliance.
Flexible Solutions
Free, no-obligation audits help us tailor inspection services to your facility’s needs.
Cost & Time Savings
Reduce costs and extend the value of your equipment with efficient inspections.
Safety Compliance
Regular inspections improve safety, reduce risk, and support better workplace attendance.
PM Program
Class A & B - Infrequent and Light Service
Periodic Plan | Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Periodic - Annual (see Notes 1 & 2) | Periodic | |||||||||||
PM Plus | Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 |
PM - Semi annual; Periodic - Annual (see note 1) | Preventative Maintenance + Periodic | Preventative Maintenance | ||||||||||
Compliance Plan | Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 |
Frequent - Monthly PM - Semi annual; Periodic - Annual | Frequent + Preventative Maintenance + Periodic | Frequent | Frequent | Frequent | Frequent | Frequent | Frequent + Preventative Maintenance | Frequent | Frequent | Frequent | Frequent | Frequent |
Class C & D - Moderate and Heavy Service
Periodic Plan | Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Periodic - Semi annual (see Notes 1 & 2) | Periodic | Periodic | ||||||||||
PM Plus | Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 |
PM - Quarterly; Periodic - Semi annual (see note 1) | Preventative Maintenance + Periodic | Preventative Maintenance | Preventative Maintenance + Periodic | Preventative Maintenance | ||||||||
Compliance Plan | Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 |
Frequent - Monthly; PM - Quarterly; Periodic - Semi annual | Frequent + Preventative Maintenance + Periodic | Frequent | Frequent | Frequent + Preventative Maintenance | Frequent | Frequent | Frequent + Preventative Maintenance + Periodic | Frequent | Frequent | Frequent + Periodic Maintenance | Frequent | Frequent |
Manufacturers' Recommendations
Asset Lifecycle Items | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Year 11 | Year 12 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Gear Box Oil Analysis | Recommended | Recommended | Recommended | Recommended | Recommended | Recommended | Recommended | Recommended | Recommended | Recommended | Recommended | Recommended |
Inspection; disassembly and maintenance will be quoted T&M | Every 5 years or 5000 hours "on" time | Every 5 years or 5000 hours "on" time | ||||||||||
Other items required per manufacturer will be quoted T&M | As per manual | As per manual | As per manual | As per manual | As per manual | As per manual | As per manual | As per manual | As per manual | As per manual | As per manual | As per manual |
- Note 1: Owner has competent maintenance personnel for frequent inspections
- Note 2: Owner has qualified maintenance personnel (4000 hours) for preventative maintenance, service and repairs
- Note 3: Please contact us regarding inspection plans for other crane classes
- Note 4: Crane interval recognition guides are available in CSA B167-16 Annex D or the CMAA Crane Service Classification standards
Your Perfect Solution Awaits!
Regulations in Canada
Regulation |
---|
CWB Certified Welders (Steel and Aluminum) |
CWB certified for welding of Steel (CSA Standard W47.1, Division 2) |
CWB certified for welding of Aluminum (CSA Standard W47.2, Division 2) |
Professional Engineers Ontario |
CLAC |
Projects
Water Weight Load Test on 25-ton double girder top running crane
Liftsafe performed a 25-ton load test on a double girder top-running crane—using custom solutions to deliver certifiable inspections with minimal downtime.
Pirate ship
frame
Liftsafe engineered and fabricated a custom aluminum ship frame for a Toronto tour company—soon to be transformed into a pirate excursion party boat
Custom Indoor platform and guardrail install
One of our customers recently purchased a brand new laser cutting machine that increased production while reducing the footprint in their facility. But there was a problem.
Woodstock Precision Machining Gorbel Easy Arm Crane
Liftsafe fabricated, installed, and inspected Workstation Cranes for a major Southern Ontario manufacturer—improving safety and efficiency by eliminating manual lifting.
Custom Fabrication
A collaborative approach to custom fabrication that enhances workplace safety and productivity.
Inspections
Helping businesses safeguard their operations and employees while staying compliant with safety regulations.
Prestart Health
& Safety Reviews
Providing Prestart Health and Safety Reviews (PHSRs) for standard and custom solutions to ensure compliance.