Preventative Maintenance

Cranes and Heavy Machinery

Management Responsibilities:

Cranes and hoists shall be operated and maintained through a coordinated and well documented equipment management program, carried out by competent personnel with clearly defined responsibilities, including:

  1. Orientation
  2. Training
  3. Occupational health and safety
  4. Protocols for testing, inspections, maintenance and monitoring, including timings, risk assessment and emergency management

Crane and Hoist systems

Key features

Skilled Technicians

Expert teams trained with 1,200+ hours annually to ensure safe, efficient inspections.

Digital Reporting

Wireless, paperless reporting with access to equipment records anytime, anywhere.

Fast Results

Wireless technology ensures inspection are processed quickly and without delays.

24/7 Access

Certificates, documentation, manuals, and reports always available through mobile access.

Standardized Inspections

40+ standard inspection types offered, making us your single source for facility compliance.

Flexible Solutions

Free, no-obligation audits help us tailor inspection services to your facility’s needs.

Cost & Time Savings

Reduce costs and extend the value of your equipment with efficient inspections.

Safety Compliance

Regular inspections improve safety, reduce risk, and support better workplace attendance.

PM Program

Class A & B - Infrequent and Light Service

Periodic Plan Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Periodic - Annual (see Notes 1 & 2) Periodic
PM Plus Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
PM - Semi annual; Periodic - Annual (see note 1) Preventative Maintenance + Periodic Preventative Maintenance
Compliance Plan Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Frequent - Monthly PM - Semi annual; Periodic - Annual Frequent + Preventative Maintenance + Periodic Frequent Frequent Frequent Frequent Frequent Frequent + Preventative Maintenance Frequent Frequent Frequent Frequent Frequent

Class C & D - Moderate and Heavy Service

Periodic Plan Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Periodic - Semi annual (see Notes 1 & 2) Periodic Periodic
PM Plus Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
PM - Quarterly; Periodic - Semi annual (see note 1) Preventative Maintenance + Periodic Preventative Maintenance Preventative Maintenance + Periodic Preventative Maintenance
Compliance Plan Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Frequent - Monthly; PM - Quarterly; Periodic - Semi annual Frequent + Preventative Maintenance + Periodic Frequent Frequent Frequent + Preventative Maintenance Frequent Frequent Frequent + Preventative Maintenance + Periodic Frequent Frequent Frequent + Periodic Maintenance Frequent Frequent

Manufacturers' Recommendations

Asset Lifecycle Items Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
Gear Box Oil Analysis Recommended Recommended Recommended Recommended Recommended Recommended Recommended Recommended Recommended Recommended Recommended Recommended
Inspection; disassembly and maintenance will be quoted T&M Every 5 years or 5000 hours "on" time Every 5 years or 5000 hours "on" time
Other items required per manufacturer will be quoted T&M As per manual As per manual As per manual As per manual As per manual As per manual As per manual As per manual As per manual As per manual As per manual As per manual

Your Perfect Solution Awaits!

DOWNLOADS

Document Format Link
Resource Guide PDF Download
Inspections Catalogue 2025 PDF Download

Regulations in Canada

Regulation
CWB Certified Welders (Steel and Aluminum)
CWB certified for welding of Steel (CSA Standard W47.1, Division 2)
CWB certified for welding of Aluminum (CSA Standard W47.2, Division 2)
Professional Engineers Ontario
CLAC

PROJECTS

Heavy Duty Crane Systems for SW Ontario Manufacturer (1)

Heavy-Duty Crane Systems for SW Ontario Manufacturer

A SW Ontario manufacturer approached Liftsafe with the need for high-capacity lifting systems to support high-volume, multi-shift production. The project required safe and efficient handling of critical components while maintaining strict uptime and scheduling demands, with a strong emphasis on safety, precision operation, and long-term serviceability.

Overhead Crane Systems for Electrical Transformer Manufacturing (1)

Custom Overhead Crane Systems for Electrical Transformer Manufacturing

A series of fully integrated overhead crane and runway systems were installed to support critical stages of the transformer manufacturing process. The systems enable safe, controlled, and precise lifting of large cores, tanks, and assemblies, improving workflow efficiency, protecting high-value components, and supporting consistent production quality, all while maintaining a strong focus on worker safety and regulatory compliance.

Related Products

Custom Fabrication

A collaborative approach to custom fabrication that enhances workplace safety and productivity.

Inspections

Helping businesses safeguard their operations and employees while staying compliant with safety regulations.

Prestart Health
& Safety Reviews

Providing Prestart Health and Safety Reviews (PHSRs) for standard and custom solutions to ensure compliance.