Liftsafe Engineering


PRE-START HEALTH & SAFETY

The Pre-Start Health and Safety Review (PSHSR) Regulation for Industrial Establishments became effective on October 7th 2000.

  • A PSR is a written report on the construction, addition, or installation of a new apparatus, structure, protective element or process, or modifications to an existing apparatus, structure, protective element or process.
  • Lifting Devices, Racking Structures and Machine Guarding are eligible for PSR exemptions providing appropriate documentation is provided by the manufacturer, installer and/or a Professional Engineer.
  • The employer is ultimately responsible for ensuring all devices are in compliance with the regulation.

 

TDS - OSHAWA TDS - OSHAWA
Bridge Crane
 
NCR - WATERLOO
Lift Table
NCR
 
STACK-A-SHELF STACK-A-SHELF - CAMBRIDGE
Cantiler Racking Structure
 
Pre Start Design
available on all new
and existing Lifting
Structures and
Devices
Pre Start Design

For more information on pre-start health and safety reviews, click here.

Lifesafe Engineering can assist you to obtain the documentation required.